Skip to Main Content Skip to Footer

APPA Library

"The Bowdoin College Experience With Commissioning"
Author: D'Angelo, David, and Clifton W. Greim
Published In: Facilities Manager
Date: November/December 1999

Discusses the benefits of commissioning through case study of Bowdoin College's new Druckenmiller Science Hall.  In commissioning every component of the heating, ventilating, and air conditioning system was physically checked to make certain that it worked as designed and, when problems were found, responsibility for correcting them was assigned and components were rechecked to verify correction.  Describes commissioning process, testing procedures, safety issues, energy efficiency, and how benefits outweigh the costs.


For a downloadable PDF of this article please search the APPA archives


Share this page. You can e-mail this description and a link to this page to any valid e-mail address.

Send this page to this email address:
(You can enter more than one email address separated by commas.)
Add your own message:
Your Name:

Return to Search Page