Skip to Main Content Skip to Footer

APPA Library

"Outside the Box: Reduce and Simplify"
Author: Plant, Frederick W.
Published In: Facilities Manager
Date: November/December 2006

Discusses the situation at Valparaiso University where several projects converged as the university planned a new natural gas and high voltage electrical system with the desired outcome that the university would no longer own or maintain the natural gas, the high voltage system, or the substation; responded to the failure of the current heating distribution system; and considered the reengineering of the Physical Plant Services trades shop from several small shops for each trade to one maintenance shop. Reviews the decision to go with a decentralized heating system, outsourcing the natural gas and electric systems, and how these changes allowed the reengineering of the trades group.


For a downloadable PDF of this article please search the APPA archives


Share this page. You can e-mail this description and a link to this page to any valid e-mail address.

Send this page to this email address:
(You can enter more than one email address separated by commas.)
Add your own message:
Your Name:

Return to Search Page